Submission
NECA/CECA Publications Store
Catalogue Overview
NECA and CECA Publication Store.
Sales of NECA and CECA publications
Available for Purchase
Job Site Journal
more info

Index: CE002


Keep accurate records of each project with day-to-day entries in CECA's Job-Site Journal. Developed specifically for electrical contractors, such a Journal is especially valuable because its detailed documentation is admissible evidence for substantiating

Member Price
more info
$11.00
Non Member Price
more info
$14.00
Manual of Labor Units (MLU) 2021-2022 Edition Book (4090-21)
more info

Index: 4090-21


An estimate is only as good as the information it is based on, and the NECA Manual of Labor Units (MLU) has been the estimating resource of choice for electrical contractors since 1923. The MLU provides an experience-based reference for estimating the electrical construction labor required to install typical electrical and communications systems.

Updates to this edition provide new units for cable bus, conduit tags, all-threaded hanger rods, coaxial cable, traffic light camera controls and much more.

    Format: Book
    Other available formats: PDF Download
    Member Price
    more info
    $175.00
    Non Member Price
    more info
    $350.00
    Manual of Labor Units (MLU) 2023-2024 Edition Book (4090-23)
    more info

    Index: 4090-23

    The hard copy book of the MLU will be available by May 1, 2024. You can order now for delivery after it becomes available.

    An estimate is only as good as the information it is based on, and the NECA Manual of Labor Units (MLU) has been the estimating resource of choice for electrical contractors since 1923. The MLU provides an experience-based reference for estimating the electrical construction labor required to install typical electrical and communications systems.

    Updates to this edition include updated labor units for electric vehicle supply equipment, cable lashing, pull string, pre-cut and field-cut strut, Connectrac, enclosed magnetic motor starters, access control, and much more.

      Format: Book
      Other available formats: PDF Download
      Member Price
      more info
      $180.00
      Non Member Price
      more info
      $360.00
      Manual of Labor Units (MLU) 2023-2024 PDF Download (4090-23D)
      more info

      Index: 4090-23D


      An estimate is only as good as the information it is based on, and the NECA Manual of Labor Units (MLU) has been the estimating resource of choice for electrical contractors since 1923. The MLU provides an experience-based reference for estimating the electrical construction labor required to install typical electrical and communications systems.

      Updates to this edition include updated labor units for electric vehicle supply equipment, cable lashing, pull string, pre-cut and field-cut strut, Connectrac, enclosed magnetic motor starters, access control and much more. 

      Format: PDF Download

      Other formats: Book
      Please note, the PDF is a secured document and cannot be printed or altered.

      The purchase of the MLU conveys a single license to the individual that purchased it. NECA views it as acceptable for the document to be transferred from one computer to another, provided it does not exist on both. 

      Note: No refunds on PDF orders.
      Member Price
      more info
      $180.00
      Non Member Price
      more info
      $360.00
      Manual of Labor Units (MLU) Edition Subscription (4090-S)
      more info

      Index: 4090-S

      NOTE: This product is a subscription service with Trade Service, not a copy of the 2021-2022 Manual of Labor Units.

      An estimate is only as good as the information it is based on, and the NECA Manual of Labor Units (MLU) has been the estimating resource of choice for electrical contractors since 1923. The MLU provides an experience-based reference for estimating the electrical construction labor required to install typical electrical and communications systems.

      NEW IN 2021: This two-year subscription provides electronic access to the NECA Manual of Labor Units. With all of the features that were formerly featured on the CD, the online portal allows subscribers to access the labor units, the ability to export sections to excel, utilize calculators, customize column factoring and more.

      Users who have TRA-SER accounts will still be able to use this subscription as an add-on, allowing the MLU information to be integrated with most major estimating software. 

      Electronic access to the MLU add-on will be provided via email and accessible within 1-2 business days. This is not a download from the NECA site.

      Member Price
      more info
      $217.00
      Non Member Price
      more info
      $586.00
      NECA Guide to Aerial Lifts (Digital Resource Kit 5031-20RK)
      more info
      Index: 5031-20RK

      Employers, owners and operators are now required to comply with ANSI's new A92 standards for mobile elevated work platforms (MWEP). NECA's Guide to Aerial Lifts is a jobsite guide designed to assist members in complying with American National Standard Institute (ANSI) MEWP equipment and training requirements. ANSI/SAIA A92.22-2018 Standard for Safe Use of Mobile Elevating Work Platforms (MEWPs) addresses the design of new aerial lift equipment and ANSI-SAIA A92.24-2018 Standard for Training Requirements for the Use, Operation, Inspection, Testing and Maintenance of Mobile Elevating Work Platforms (MEWPs) provides an overview of required training for operators, supervisors and maintenance personnel. 

      Aerial lifts are so common in the electrical construction industry that a description or definition may not seem warranted. However, to understand applicable regulations and the scope of what is included, it is necessary to review both the Occupational Safety and Health Administration (OSHA) and ANSI definitions and descriptions. 

      The NECA Guide to Aerial Lifts, is specifically designed to assist contractors in understanding and complying with new OSHA and ANSI MEWP equipment and training requirements. Now available for purchase in the NECA Store, this handy jobsite guide is printed on weatherized and tear-proof paper, and perfect for use on the jobsite or for your company's safety training.

      NOTE: This resource kit includes a PowerPoint presentation, a digital version of the guide and additional appendix resources.
      Member Price
      more info
      $168.00
      Non Member Price
      more info
      $340.00
      NECA Guide to Aerial Lifts Guide 5031-20 Booklet
      more info
      Index: 5031-20

      Employers, owners and operators are now required to comply with ANSI's new A92 standards for mobile elevated work platforms (MWEP). NECA's Guide to Aerial Lifts is a jobsite guide designed to assist members in complying with ANSI MEWP equipment and training requirements. ANSI/SAIA A92.22-2018 Standard for Safe Use of Mobile Elevating Work Platforms (MEWPs) addresses the design of new aerial lift equipment and ANSI-SAIA A92.24-2018 Standard for Training Requirements for the Use, Operation, Inspection, Testing and Maintenance of Mobile Elevating Work Platforms (MEWPs) provides an overview of required training for operators, supervisors and maintenance personnel.

      What is an Aerial Lift? 

      Aerial lifts are so common in the electrical construction industry that a description or definition may not seem warranted. However, to understand applicable regulations and the scope of what is included, it is necessary to review both the Occupational Safety and Health Administration (OSHA) and American National Standard Institute (ANSI) definitions and descriptions. 

      OSHA describes aerial lifts as: 

      • Any vehicle-mounted device used to elevate personnel 
      • Work platform that can move vertically and/or horizontally 
      • Printed on weatherized and tear resistant paper, this handy guide is perfect for use on the jobsite or for your company's safety briefings. 

      Member Price
      more info
      $42.00
      Non Member Price
      more info
      $84.00
      NECA Guide to Aerial Lifts Guide 5031-20D PDF Download
      more info
      Index: 5031-20D

      Employers, owners and operators are now required to comply with ANSI's new A92 standards for mobile elevated work platforms (MWEP). NECA's Guide to Aerial Lifts is a jobsite guide designed to assist members in complying with American National Standard Institute (ANSI) MEWP equipment and training requirements. ANSI/SAIA A92.22-2018 Standard for Safe Use of Mobile Elevating Work Platforms (MEWPs) addresses the design of new aerial lift equipment and ANSI-SAIA A92.24-2018 Standard for Training Requirements for the Use, Operation, Inspection, Testing and Maintenance of Mobile Elevating Work Platforms (MEWPs) provides an overview of required training for operators, supervisors and maintenance personnel.

      Aerial lifts are so common in the electrical construction industry that a description or definition may not seem warranted. However, to understand applicable regulations and the scope of what is included, it is necessary to review both the Occupational Safety and Health Administration (OSHA) and ANSI definitions and descriptions. 

      The NECA Guide to Aerial Lifts, is specifically designed to assist contractors in understanding and complying with new OSHA and ANSI MEWP equipment and training requirements. Now available for purchase in the NECA Store, this handy jobsite guide is printed on weatherized and tear-proof paper, and perfect for use on the jobsite or for your company's safety training.

      NOTE: This is a PDF Download of the NECA Guide to Aerial Lifts. 


      Also available: 
      NECA Guide to Aerial Lifts Resource Kit (5031-20RK) which includes a PDF download of the guide, supplemental annex materials and a PowerPoint presentation for company training.
      Member Price
      more info
      $42.00
      Non Member Price
      more info
      $84.00
      NECA Guide to Shock and Arc Flash Risk Assessments (5032-20)
      more info
      Index: 5032-20

      NECA has developed a new safety guide to assist with understanding how to properly conduct Shock and Arc Flash Risk Assessments according to NFPA 70E, Standard for Electrical Safety in the Workplace. 

      The NECA Guide to Shock and Arc Flash Risk Assessments, Index #5032-20 is available in the NECA store for purchase either in printed form or downloadable as part of a digital resource kit that includes a PDF of the guide, a training PowerPoint and PDF versions of each risk assessment forms. This guide provides invaluable information for employees and employers to properly conduct and document these risk assessments that are necessary to protect workers and ensure a proper Electrical Safe Work Condition can be established according to NFPA and OSHA.  

      NECA continues to lead in developing safety resources that members can use for effective safety management and training. 

      Member Price
      more info
      $42.00
      Non Member Price
      more info
      $84.00
      NECA Safety Manual Powerpoint & Digital Resource Kit Download (5030RK-18)
      more info
      Index: 5030RK-18

      Why do I need a manual? Most agree on the value of safety. Morally, electrical contractors establish safety rules and require employees to follow them to prevent anyone from getting hurt. From a regulatory perspective we need to comply with Occupational Safety and Health Administration (OSHA) regulations. Finally, it just makes good business sense. Accidents can be costly. Higher insurance premiums and hidden costs, such as down time and administrative overhead, can significantly affect the success of any business. On top of this many customers won't hire contractors who fail to prove they run a safe company. A comprehensive, effective-written safety manual is the first step in establishing and proving your company as safe. What does a safety manual do? A written safety manual: - serves as a mutual agreement: 1) between employer and employee stipulating what procedures will be followed to ensure the safety of the employee. 2)with the host employer/customer it is an agreement that the contractor will follow appropriate safety rules to protect the customer from the negative impact of an incident that could occur on their property during a given project. - is a strong communication media to ensure employees, host employers/customers and OSHA know and understand what actions are to be taken to ensure safety for all to which it applies. Why should I buy the NECA manual? NECA understands the many challenges (prequalification hurdles, OSHA compliance, special requirements set by NFPA 70E) electrical contractors face and what is needed. The new NECA Manual targets those elements. The Manual: - is based on programs that have met 3rd party evaluator demands for the prequalification process - includes those sections/topics needed for OSHA compliance and requested by host employers/customers - is an interactive and collaborative living document incorporating feedback from users. NECA members using the document provide information on new elements requested by customers or regulatory agencies. Changes are made to the program in its digital format and users can download the updates as needed. Order the new NECA Safety Manual today! With these new features electrical contractors will be better able to protect employees, more easily prequalify for customer projects and comply with all OSHA requirements. NECA Digital Resources kits includes a training PowerPoint, a PDF copy of the guide and any forms or checklists that are associated with the guide.
      Member Price
      more info
      $670.00
      Non Member Price
      more info
      $850.00
      NFPA 70E Lockout/Tagout Guide 5400-18
      more info
      Index: 5400-18

      The NFPA 70E Guide to Lockout/Tagout manual is designed as a field guide and printed on special coated paper. It provides a brief overview of NFPA 70E, applicable OSHA regulations, and defines what NFPA 70E considers an "Electrically Safe Work Condition." It then offers a flow chart for determining the appropriate form of control needed such as Individual Qualified Employee Control Procedure, Simple Lockout/Tagout Procedure or Complex Lockout/Tagout Procedure. Once the user determines the form of control, the flow chart directs the user to turn to the applicable section. Each section presents the required LOTO steps in sequence. A separate section identifies procedures for removal of the LOTO. The appendices provide a listing of useful definitions and a checklist for determining locks and tags suitable for use.

      Member Price
      more info
      $42.00
      Non Member Price
      more info
      $84.00
      NFPA 70E Lockout/Tagout Resource Kit 5400-18RK
      more info
      Index: 5400-18RK

      The NFPA 70E Guide to Lockout/Tagout manual is designed as a field guide and printed on special coated paper. It provides a brief overview of NFPA 70E, applicable OSHA regulations, and defines what NFPA 70E considers an "Electrically Safe Work Condition." It then offers a flow chart for determining the appropriate form of control needed such as Individual Qualified Employee Control Procedure, Simple Lockout/Tagout Procedure or Complex Lockout/Tagout Procedure. Once the user determines the form of control, the flow chart directs the user to turn to the applicable section. Each section presents the required LOTO steps in sequence. A separate section identifies procedures for removal of the LOTO. The appendices provide a listing of useful definitions and a checklist for determining locks and tags suitable for use.

      Member Price
      more info
      $150.00
      Non Member Price
      more info
      $310.00
      NFPA 70E Personal Protective Equipment (PPE) Selector (5024-21)
      more info
      Index: 5024-21

      The NFPA 70E Personal Protective Equipment (PPE) Selector Guide, (5024-21), was developed to assist the industry in understanding and applying the provisions found in "NFPA 70E, The Standard for Electrical Safety in the Workplace". It has been revised to the current 2021 edition of this NFPA standard and provides a simplified approach and understanding to the Personal Protective Equipment requirements to help in keeping workers safe. Maintenance Related Safety Requirements are now included in the standard and is a basis for applying the provisions found in the Table Method for implementing Personal Protective Equipment and Arc Flash Protection.

      Member Price
      more info
      $42.00
      Non Member Price
      more info
      $84.00
      Normal Project Duration Book (5076-04)
      more info
      Index: 5076-04

      A "normal" project is defined as a project that is managed properly and proceeds as expected. Benchmark indicators for normal electrical project duration are established in this study. A relationship between project size in work hours and normal project duration is developed and presented in a series of tables and charts. 
      Member Price
      more info
      $32.00
      Non Member Price
      more info
      $95.00
      Normal Project Duration PDF Download (5076-04D)
      more info
      Index: 5076-04D

      A "normal" project is defined as a project that is managed properly and proceeds as expected. Benchmark indicators for normal electrical project duration are established in this study. A relationship between project size in work hours and normal project duration is developed and presented in a series of tables and charts. 

      Note: No refunds on PDF orders
      Member Price
      more info
      $32.00
      Non Member Price
      more info
      $95.00
      Officer and Overhead Personnel Compensation Report 2021 PDF (1065-21PDF)
      more info
      Index: 1065-21

      This report presents a detailed analysis of key compensation and workforce benefits data from companies operating in the electrical contracting industry. Based on confidential surveys submitted by electrical contractors, this report includes a compilation and analysis of data segmented by total company sales volume, NECA chapter affiliation, and union status.

      The survey includes data on areas such as:

      - Annual Wages Paid to Overhead Employees 

      - Officer Compensation (Salaries, Bonuses and Dividends)

      - Employee Benefit Information 

      - Vacation and Sick Leave Policies

      - Retirement/Pension Plan Information

      Member Price
      more info
      $75.00
      Non Member Price
      more info
      $170.00
      Outside Line Safety Talks (5059L-21)
      more info
      Index: 5059L-21

      NECA Safety has updated the Outside Line Safety Talks for the outside electrical construction and utility industry. These talks include 100 safety talks outside specific content to enhance company safety programs and provide new and updated information to employees. Many of these talks are based in industry best practices and OSHA regulations. These talks are available for electronic delivery in PDF and can be printed out with an appropriate sign-in sheet attached to each talk. (Zip File)

      Member Price
      more info
      $150.00
      Non Member Price
      more info
      $299.00
      Project Peak Workforce Book
      more info
      Index: 5074-04

      This study establishes the baseline for electrical project peak workforce size. A relationship between project size in work hours and peak workforce is developed and presented in a series of tables and charts. The study also identifies the recommended number of workers for different project sizes.
      Member Price
      more info
      $32.00
      Non Member Price
      more info
      $95.00
      Project Peak Workforce PDF Download
      more info
      Index: 5074-04D

      This study establishes the baseline for electrical project peak workforce size. A relationship between project size in work hours and peak workforce is developed and presented in a series of tables and charts. The study also identifies the recommended number of workers for different project sizes.

      Note: No refunds on PDF orders.
      Member Price
      more info
      $32.00
      Non Member Price
      more info
      $95.00
      Rate of Manpower Consumption Booklet
      more info
      Index: 5075-04

      The rate of manpower consumption is identified for the electrical contracting industry and is displayed graphically through a manpower-loading curve. The study also identifies a powerful method for integrating multiple management and control tools in order to assess actual project status. This method, called the Trapezoidal Technique, combines estimating methods for normal project duration, peak workforce level, and rate of manpower consumption into one easy-to-use formula.

      Also available in PDF.
      Member Price
      more info
      $29.00
      Non Member Price
      more info
      $89.00
      Rate of Manpower Consumption PDF
      more info
      Index: 5075-04PDF

      The rate of manpower consumption is identified for the electrical contracting industry and is displayed graphically through a manpower-loading curve. The study also identifies a powerful method for integrating multiple management and control tools in order to assess actual project status. This method, called the Trapezoidal Technique, combines estimating methods for normal project duration, peak workforce level, and rate of manpower consumption into one easy-to-use formula.

      Also available in Booklet format.
      Member Price
      more info
      $29.00
      Non Member Price
      more info
      $89.00
      Temporary Power Guide PDF
      more info
      Index: 5030PDF

      This guide was developed by NECA to assist the industry in understanding and applying all applicable requirements for installing temporary power systems and the use of temporary power. The content is based on multiple codes and standards and is designed as a quick reference for the electrical contractors and electricians working in the field. The codes and standards referenced in this guide are readily available and it is recommended that contractors obtain copies of each.


      Also available in Book format.
      Member Price
      more info
      $54.00
      Non Member Price
      more info
      $109.00
      The Effect of Multi-Story Buildings on Productivity Book
      more info
      Index: 5071-04

      Buildings with 13 stories or more require additional labor costs that are unique to tall buildings. These increased costs are associated with: (1) increased quantities of materials; (2) additional time required to move workers, tools, and materials vertically; and (3) a subsequent loss of productivity. This study identifies unique tall-building costs, such as type of occupancy, quantity of floor area, and number of change orders. Worksheets and graphs are provided to assist the electrical contractor with the development of an accurate estimate of costs, or work hours, for a multi-story building.
      Member Price
      more info
      $32.00
      Non Member Price
      more info
      $95.00
      The Effect of Multi-Story Buildings on Productivity PDF Download
      more info
      Index: 5071-04D

      Buildings with 13 stories or more require additional labor costs that are unique to tall buildings. These increased costs are associated with: (1) increased quantities of materials; (2) additional time required to move workers, tools, and materials vertically; and (3) a subsequent loss of productivity. This study identifies unique tall-building costs, such as type of occupancy, quantity of floor area, and number of change orders. Worksheets and graphs are provided to assist the electrical contractor with the development of an accurate estimate of costs, or work hours, for a multi-story building.

      Note: No refunds on PDF orders.
      Member Price
      more info
      $32.00
      Non Member Price
      more info
      $95.00
      The Effect of Temperature on Productivity Book
      more info

      Index: 5072-04


      The effects of extreme combinations of temperature and humidity on electrical labor productivity are identified. The results are presented in a series of tables and charts, which provide a powerful tool that can be used by contractors to adjust their bids during the bidding process and to support requests for time extensions and compensation during the construction process.

      Member Price
      more info
      $32.00
      Non Member Price
      more info
      $95.00
      The Effect of Temperature on Productivity PDF Download
      more info

      Index: 5072-04 PDF


      The effects of extreme combinations of temperature and humidity on electrical labor productivity are identified. The results are presented in a series of tables and charts, which provide a powerful tool that can be used by contractors to adjust their bids during the bidding process and to support requests for time extensions and compensation during the construction process.


      Note: No refunds on PDF orders.

      Member Price
      more info
      $32.00
      Non Member Price
      more info
      $95.00
      Tool & Equipment Rental Schedule, 2021-22 Book (5065-21)
      more info

      Index: 5065-21

      Construction tools and equipment are an essential part of an electrical contractor's business and can represent a significant investment, and NECA is here to help you determine the return you should get on that investment.

      NECA recommends that tool and equipment expenses are included in the estimate as direct job expenses, and this comprehensive guide is designed to assist in not only internal estimating, but also cost accounting and price quotes to customers. Rental rates are provided based on average initial purchase price, ownership expenses and use periods.

      Updates in this edition include new equipment and updated list prices for all items along with an improved user experience.

      Format: Book

      Other formats: PDF Download

      Member Price
      more info
      $95.00
      Non Member Price
      more info
      $440.00
      Tool & Equipment Rental Schedule, 2021-22 PDF Download (5065-21D)
      more info

      Index: 5065-21D

      Construction tools and equipment are an essential part of an electrical contractor's business and can represent a significant investment, and NECA is here to help you determine the return you should get on that investment.

      NECA recommends that tool and equipment expenses are included in the estimate as direct job expenses, and this comprehensive guide is designed to assist in not only internal estimating, but also cost accounting and price quotes to customers. Rental rates are provided based on average initial purchase price, ownership expenses and use periods.

      Updates in this edition include new equipment and updated list prices for all items along with an improved user experience.

      Formats: PDF Download
      Note: No refunds on PDF orders.
      Member Price
      more info
      $95.00
      Non Member Price
      more info
      $440.00
      Toolbox Talks 2 5059-07
      more info
      Index: 5059-07

      Now available, a second edition of the convenient CD collection of up-to-date toolbox talks especially designed for the electrical contractor. Delivered in Adobe format, it provides you with 100 NEW weekly training talks on electrical hazards and controls as well as the common construction safety risks - everything from arc fault hazards to workplace violence. Do that necessary training and have ready records to meet the challenges.
      Member Price
      more info
      $150.00
      Non Member Price
      more info
      $310.00
      2021 NECA Financial Benchmarker Report PDF Download (1055-21)
      more info

      Index: 1055-21


      The 2021 NECA Financial Benchmarker Report (1055-21) presents a detailed analysis of key financial data within the electrical construction industry. Using the information within this report, electrical contractors can compare and analyze their own company's financial performance statistics to identify business strengths, weaknesses and performance improvement opportunities. This report also provides a valuable industry standard for your use during audits, claims, change order negotiation, or with a banker/bonding agent.


      The NECA Financial Benchmarker report is based on data collected in the 2020 financial year and was developed in conjunction with the Construction Financial Management Association (CFMA).

      Member Price
      more info
      $69.00
      Non Member Price
      more info
      $149.00
      2022 NECA Financial Benchmarker Report PDF Download (1055-22)
      more info

      Index: 1055-22


      The 2022 NECA Financial Benchmarker Report (1055-22) presents a detailed analysis of key financial data within the electrical construction industry. Using the information within this report, electrical contractors can compare and analyze their own company's financial performance statistics to identify business strengths, weaknesses and performance improvement opportunities. This report also provides a valuable industry standard for your use during audits, claims, change order negotiation, or with a banker/bonding agent.


      The NECA Financial Benchmarker report is based on data collected in the 2021 financial year and was developed in conjunction with the Construction Financial Management Association (CFMA).

      Member Price
      more info
      $69.00
      Non Member Price
      more info
      $149.00
      2023 NECA Financial Benchmarker Report PDF Download (1055-23PDF)
      more info

      Index: 1055-23PDF


      The 2023 NECA Financial Benchmarker Report (1055-23PDF) presents a detailed analysis of key financial data within the electrical construction industry. Using the information within this report, electrical contractors can compare and analyze their own company's financial performance statistics to identify business strengths, weaknesses and performance improvement opportunities. This report also provides a valuable industry standard for your use during audits, claims, change order negotiation, or with a banker/bonding agent. The NECA Financial Benchmarker report is based on data collected in the 2022 financial year and was developed in conjunction with the Construction Financial Management Association (CFMA).


      Member Price
      more info
      $69.00
      Non Member Price
      more info
      $149.00
      Guide to Electrical Contractors Claims Management, Volume 1, Second Edition PDF
      more info
      Index: 40061PDF

      This handbook takes you through the steps to become successful at preparing for and conducting claims negotiation, arbitration, and litigation. A description of the tactics for settlement and a detailed examination of the most frequently occurring types of claims are included. The emphasis is placed on accurate and orderly record keeping and paperwork management for best results.

      Also available in Book format.

      Note: No refunds on PDF orders.
      Member Price
      more info
      $9.00
      Non Member Price
      more info
      $69.00
      Guide to Electrical Contractors Claims Management, Volume 2, Second Edition PDF
      more info
      Index: 40062PDF

      This handbook takes you through the steps to become successful at preparing for and conducting claims negotiation, arbitration, and litigation. A description of the tactics for settlement and a detailed examination of the most frequently occurring types of claims are included. The emphasis is placed on accurate and orderly record keeping and paperwork management for best results.

      Also available in Book format.

      Note: No refunds on PDF orders.
      Member Price
      more info
      $9.00
      Non Member Price
      more info
      $69.00
      Guide to Electrical Contractors Claims Management, Volume 3, Second Edition PDF
      more info
      Index: 40063PDF

      This booklet supplies additional information on claims settlement and includes a report on a study of the average effects of schedule delays and disruption on labor productivity. It also includes information on extended overhead on delayed projects.

      Also available in Booklet format.

      Note: No refunds on PDF orders.
      Member Price
      more info
      $9.00
      Non Member Price
      more info
      $69.00
      Inside Electrical Construction Safety Talks (5059W-22)
      more info
      Index: 5059W-22

      NECA Safety is excited to announce the release of updated Inside Electrical Construction Safety Talks for the industry available now in the NECA Store. With over a hundred new and updated safety talks ranging from fall protection, excavations, first aid and NFPA 70E requirements, these talks are available for electronic delivery in PDF and can be printed out with an appropriate sign-in sheet attached to each talk. (Zip File)

      Member Price
      more info
      $150.00
      Non Member Price
      more info
      $299.00
      NTCCC Best Practices Guide for Trade Contractors PDF Download
      more info
      As the construction market gets busier, lack of standardization of tendering practices will be even more of a problem as owners/designers/general contractors/construction managers/ trade contractors may not have their most experienced people on every project. A realistic set of "Terms and Conditions" serves to improve the working environment for all parties for a little short-term cost and likely a major reduction of long-term expense.

      Trade Contractors should carefully review all terms and conditions of the contract to ensure they understand all provisions and associated risks. Trade Contractors have the opportunity to include provisions of their own by inserting appropriate clauses that address any concerns they may have regarding a fair allocation of risk or clarification of obligations under contracts. This document is intended to identify some potential areas where Trade Contractors may want to exercise caution and take appropriate steps to ensure their best interests are maintained. 

      Note: No refunds on PDF orders.
      Member Price
      more info
      $0.00
      Change Order Users Guide PDF Download
      more info
      Changes in projects are becoming more complicated and more costly to owners. There are many elements involved beyond direct labour and materials that enter into the estimated cost of making a change.
      The prudent owner will give serious consideration to these when contemplating
      a major change.

      The cost of making changes depends upon the magnitude of the change, the timing, scheduling, etc. While small changes may not be expensive individually, a large number of small changes on the same job can become extremely expensive. This is mainly due to the disruption of the job schedule and manpower requirements necessary to maintain the contract completion date.
      Member Price
      more info
      $0.00
      Non Member Price
      more info
      $5.00
      NTCCC Guide to CCA -1 Stipulated Price Subcontract PDF Download
      more info
      This Guide has been commissioned by the National Trade Contractors Coalition of Canada to assist its members in using the new CCA 1-2008 Stipulated Price Subcontract form of subcontract agreement.

      The CCA 1-2008 document is the latest version of the standard subcontract form most widely used throughout Canada. It was created in a process of joint consultation between general contractors and trade contractors, and seeks to fairly balance the rights and responsibilities of each.

      NTCCC endorses and encourages the use of CCA 1-2008.
      Member Price
      more info
      $0.00
      Time out warning
      The quantity you have selected for your registration will be released back into inventory if you do not restart the timer. Click 'Renew' to reset the timer and give you more time to complete your registration.
      Timer Expired
      The timer reserving your items has expired, the items have been returned to inventory. You can try to purchase your items again.
      Inventory Sold Out
      Sorry during the processing of your request the inventory sold out.
      More Info
      Gregg Whitty
      Email